Page 60 - TRAINING MODULE_BTM
P. 60

BUMI TUNGGAL MAJU SDN BHD  TRAINING MODULE



                    •  Cover the entire area to be cleaned
                    •  Wipe off baseboards before they dry.

                    •  After the floor has dried, remove the wet floor signs and return furniture and other items
                        to their proper positions.


                 APPLYING FLOOR FINISH

                 Applying first coat of seal:

                    •  Pour floor finish into lined mop bucket and place a clean, non-rusty wringer into the
                        bucket
                    •  Immerse clean mop into the finish
                    •  Wring out mop to eliminate dripping

                    •  Apply a thin coat of finish to the floor
                    •  Apply floor finish by running floor finish applicator mop parallel to and next to the
                        baseboard
                    •  Do not apply in vertical portions of baseboards and walls
                    •  Work in a "U" shape around baseboards and work from outward inward
                    •  Use additional finish, as needed, per manufacturer instructions and cover the entire floor
                    •  Try to avoid splashing the floor finish
                    •  Before applying another coat, allow finish to dry completely.

                 Applying second coat of seal:


                    •  Repeat the above instructions
                    •  You may wish to avoid building up edges by keeping a few inches away from the
                        baseboards
                    •  Apply a thin coat of finish
                    •  The second application should be made using a "figure 8" pattern, which reduces back
                        fatigue
                    •  Allow second coat to dry completely.

                 Applying additional coats:


                    •  Repeat the above instructions using the same floor finish for the next two coats and all
                        subsequent ones
                    •  More coats allows more protection for the floor and a better appearance
                    •  Apply at least two coats of finish over the seal, if a high-speed burnishing program is
                        used
                    •  Allow floor to dry completely before opening to traffic.

                 FLOOR STRIPPING





                                                             58
   55   56   57   58   59   60   61   62   63   64   65